It was a real thrill to get construction underway at 1260 Lake Blvd. We knew it would take a long time, but that all the hard work and waiting would be worth it.
The first thing the brewery needed was a set of double doors to be able to bring in the four 10-barrel tanks, the mash ton, and the boil kettle. After that the jackhammering started on the trench drains. Each day one step closer…