Joey and Scott drilled the holes for the taps in the cold storage. Another step closer to having cold beer flowing at the brewery. Once the tap holes were drilled, the two installed the 8 tap lines and handles.
The next project, for another day, was to hang the manifolds inside the cold storage to provide CO2 to the beer.